Despatch of a manroland 905
22. July 2010
Our technicians had to do precision work once more.
Also during the 3rd despatch of a man roland 900 machine, our technicians had to do a precision job when loading the heavy machine parts into the container.
We needed five 40' high cube containers and one 40' flat rack for loading of this machine.
Meanwhile, the machine is on its way to its final destination in Asia.